Letter of recommendation from McDonald’s who have installed the ALP lightweight, pre-insulated rigid duct.

A case study where ALP lightweight, pre-insulated rigid duct has been installed at O2 Arena.

A case study where ALP lightweight, pre-insulated rigid duct has been installed at Mydonose Showland.

A case study where ALP lightweight, pre-insulated rigid duct has been installed at the Emergency Camp Hospital.

A case study where ALP lightweight, pre-insulated rigid duct has been installed at the Boeing 787 Factory.

Ductus logo
© 2017 Dutus. All rights reserved

Search