Boeing 787 Factory

2020-07-04T08:01:21+00:00

A case study where ALP lightweight, pre-insulated rigid duct has been installed at the Boeing 787 Factory.

Boeing 787 Factory 2020-07-04T08:01:21+00:00

EMERGENCY Camp Hospital

2020-07-04T08:07:41+00:00

A case study where ALP lightweight, pre-insulated rigid duct has been installed at the Emergency Camp Hospital.

EMERGENCY Camp Hospital 2020-07-04T08:07:41+00:00

MC DONALD’S Letter of Recommendation

2020-07-26T19:09:02+00:00

Letter of recommendation from McDonald’s who have installed the ALP lightweight, pre-insulated rigid duct.

MC DONALD’S Letter of Recommendation 2020-07-26T19:09:02+00:00

Mydonose Showland

2020-07-04T08:09:50+00:00

A case study where ALP lightweight, pre-insulated rigid duct has been installed at Mydonose Showland.

Mydonose Showland 2020-07-04T08:09:50+00:00

O2 Arena

2020-07-23T22:57:36+00:00

A case study where ALP lightweight, pre-insulated rigid duct has been installed at O2 Arena.

O2 Arena 2020-07-23T22:57:36+00:00