A case study where ALP lightweight, pre-insulated rigid duct has been installed at the Boeing 787 Factory.

A case study where ALP lightweight, pre-insulated rigid duct has been installed at the Emergency Camp Hospital.

A case study where ALP lightweight, pre-insulated rigid duct has been installed at Mydonose Showland.

A case study where ALP lightweight, pre-insulated rigid duct has been installed at O2 Arena.

Letter of recommendation from McDonald’s who have installed the ALP lightweight, pre-insulated rigid duct.

Got a project in mind?

Subscribe to our Newsletter

Get the latest updates from us by subscribing below

    © 2024 DUCTUS.
    All Rights Reserved.

    magnifiercross