Case Studies 2019-02-01T05:49:14+00:00

THE DOCS THAT YOU WANT

If you need a document that is not listed on this page,
please feel free to contact us.

Published in - Case Studies

Boeing 787 Factory

A case study where ALP lightweight, pre-insulated rigid duct has been installed at the Boeing 787 Factory.

Published in - Case Studies

EMERGENCY Camp Hospital

A case study where ALP lightweight, pre-insulated rigid duct has been installed at the Emergency Camp Hospital.

Published in - Case Studies

Mydonose Showland

A case study where ALP lightweight, pre-insulated rigid duct has been installed at Mydonose Showland.

Published in - Case Studies

O2 Arena

A case study where ALP lightweight, pre-insulated rigid duct has been installed at O2 Arena.

Published in - Case Studies

MC DONALD’S Letter of Recommendation

Letter of recommendation from McDonald’s who have installed the ALP lightweight, pre-insulated rigid duct.