
Boeing 787 Factory
A case study where ALP lightweight, pre-insulated rigid duct has been installed at the Boeing 787 Factory.

EMERGENCY Camp Hospital
A case study where ALP lightweight, pre-insulated rigid duct has been installed at the Emergency Camp Hospital.

Mydonose Showland
A case study where ALP lightweight, pre-insulated rigid duct has been installed at Mydonose Showland.

O2 Arena
A case study where ALP lightweight, pre-insulated rigid duct has been installed at O2 Arena.

MC DONALD’S Letter of Recommendation
Letter of recommendation from McDonald’s who have installed the ALP lightweight, pre-insulated rigid duct.